For wind–solar hybrid and round-the-clock renewable developers
What land needs to offer a wind–solar hybrid project, and large parcels in Solapur district that you can evaluate. Acreage is only the starting point.
Hybrid projects combine wind turbines and solar arrays on one site or nearby sites, sharing the grid connection. This page is for developers and land teams screening Maharashtra sites for hybrid capacity. It explains why a large parcel is not automatically a hybrid site, and lists parcels on 16pur.com that can be assessed.
Project requirements at a glance
Wind and solar resource assessment
Solar resource is fairly even across a district and can be estimated from satellite data. Wind is different. It changes with terrain, height and local obstacles. A useful first screen is the Global Wind Atlas and data from the National Institute of Wind Energy. Investment decisions normally need on-site measurement over at least a year, correlated with long-term data.
The wind resource at every listing on this page is To be confirmed.
Land configuration and turbine placement
- Turbines are usually spaced several rotor diameters apart, with wider spacing in the main wind direction, to limit wake losses.
- Setbacks from roads, homes, power lines and property boundaries reduce the usable area.
- Elongated parcels across the wind direction can suit a turbine row; compact blocks may suit solar better.
- Solar arrays should avoid turbine shadow and the crane pads and access roads that turbines need.
- Where land is held by many owners, turbine points, access corridors and cable routes each need separate agreement.
Transmission and evacuation
A hybrid plant usually shares one pooling substation and one line to the grid. Confirm the connection point, the voltage level, spare capacity and the approvals needed from the transmission utility. Hybrid projects can also be built by adding wind or solar to an existing plant, where the existing connection has margin.
Why acreage alone does not establish suitability
A 600 or 1,000 acre parcel may have a weak wind resource, unsuitable terrain, no heavy-vehicle access or no evacuation capacity. Any of these can rule it out. Treat acreage as the first filter, then confirm resource, layout, access and grid before calling a site “hybrid-ready”.
Large parcels you can evaluate
None of these listings has been assessed for wind. They are large enough to be screened.
These are listings published on 16pur.com. Details are shown as stated in each listing. Current availability, title, contiguity, ownership, land use and infrastructure must be confirmed through documents and a site visit before any decision. A listing that says “suitable for solar” or similar is the seller’s description, not a technical assessment or approval.

1,500 acres at Kirnalli, Akkalkot
Kirnalli, Akkalkot taluka, Solapur district
- Area
- 1,500 acres
- Asking
- ₹6.50 lakh per acre (as listed)
- Title & ownership
- To be confirmed
- Listing describes padik / khadkal (uncultivated, rocky) land
- Listing states: near Wagdhari 132 kV substation; power point about 10 km
- About 30 km from Akkalkot (as listed)

1,000 acres at Waddgari, Akkalkot
Waddgari, Akkalkot–Umarga Road, Akkalkot taluka, Solapur district
- Area
- 1,000 acres
- Asking
- ₹7 lakh per acre; ₹70 crore total (as listed)
- Title & ownership
- To be confirmed
- Listing describes agricultural / murum land
- Listing states: large contiguous parcel
- Road access: as per location (listing)

600 acres at Wadacha Tanda
Wadacha Tanda, near Wadgaon Fanepur, Solapur district
- Area
- 600 acres
- Asking
- ₹7.50 lakh per acre; ₹45 crore total (as listed)
- Title & ownership
- To be confirmed
- Listing describes padik / khadkal agricultural land
- Between Solapur–Hyderabad Highway and Tuljapur Road (as listed)
- Outright sale only (as listed)

700 acres at Ambewadi, Ahilyanagar
Ambewadi, Ahilyanagar district (not Solapur)
- Area
- 700 acres
- Asking
- ₹7 lakh per acre; ₹49 crore total (as listed)
- Title & ownership
- To be confirmed
- Listing states: large continuous parcel
- Listing states: good road connectivity
- Located in Ahilyanagar district, outside Solapur
Suitability checklist
| What to verify | Status for listed parcels |
|---|---|
| Hub-height wind speed and direction | To be confirmed |
| Solar irradiation | To be confirmed |
| Title, owners and contiguity | To be confirmed |
| Heavy-vehicle route from highway to site | To be confirmed |
| Substation, capacity and line route | To be confirmed |
| Aviation height clearance and other permissions | To be confirmed |
| Land classification and conversion needs | To be confirmed |
Purchase or lease
Hybrid developers often lease rather than buy, because turbines need control of large areas but occupy little of it. Lease terms usually run for the project life plus decommissioning. Purchase may suit the solar blocks and substation. Whether each landowner will lease is To be confirmed. The purchase and lease comparison on the solar project land page applies here too.
How enquiries are handled
- Share your requirement. Project type, acreage, budget, purchase or lease, location preference and timeline.
- Review options. We share listings on 16pur.com that broadly match, with the information available for each.
- Site visit. Visit the land with the seller or their representative.
- Due diligence. Your lawyer and technical team check title, land use, access and infrastructure.
- Commercial discussion. Price or lease terms are discussed with the seller.
- Documentation. Agreement and registration, handled with your own legal advisers.
16pur.com is a property listing platform run by Kulkarni Patil Infracon Estates LLP. The exact scope of services beyond listings and introductions, such as land aggregation or acquisition support, is To be confirmed. Ask Mandar Kulkarni what support is available for your project.
Frequently asked questions
What counts as a wind–solar hybrid project?
Under India’s National Wind-Solar Hybrid Policy (2018), a project is treated as hybrid when the smaller of the two sources is at least 25% of the rated capacity of the larger one.
Is Solapur good for wind?
We do not make that claim. Wind resource varies a lot over short distances and with height. Check NIWE data and Global Wind Atlas, then install a measurement mast at the site for at least a year before investment decisions.
Is a 1,000 acre parcel enough for a hybrid project?
Acreage alone does not decide it. Turbines need spacing in the main wind direction and setbacks from roads, homes and boundaries. Solar arrays must avoid turbine shadows and access roads. The layout, not the acreage, decides capacity.
Do turbines need the whole parcel?
No. Turbines occupy small footprints, but the spacing between them sets how much land is controlled. Some developers lease turbine points and corridors rather than buying the full area.
Which listings are suitable for wind?
None of the listings has wind data that we can share. The large parcels shown can be evaluated, but wind suitability is to be confirmed for each.
Related pages
Land for solar power projects
Acreage per MW, grid and purchase or lease.
Solar land due diligence checklist
Title, contiguity and ownership checks for large parcels.
Large project land in Maharashtra
All sectors and large listings.
Sources
- IEA policy database: National Wind-Solar Hybrid Policy (MNRE, 2018)
- Global Wind Atlas (DTU / World Bank): indicative wind resource data
- National Institute of Wind Energy (NIWE)
- Global Solar Atlas (World Bank / Solargis): site solar resource data
- Energetica India: MNRE scheme for solar parks (land of about 5 acres per MW)
Policy and scheme terms change. Check the current official text before relying on any figure.
Project requirement form
Name, phone, project type and acreage are enough to start. Other fields are optional. Your details go only to Mandar Kulkarni at 16pur.com.
Send your project requirement
Looking for land for a solar, wind–solar, data centre or warehousing project? Share your acreage, budget, purchase or lease preference, and infrastructure requirements with Mandar Kulkarni.
Mandar Kulkarni
Kulkarni Patil Infracon Estates LLP
+91 80876 40953
mandar@16pur.com
Flat No. 501, Sukhada Appt, Vaman Nagar, Jule Solapur, Solapur – 413004, Maharashtra, India